Millicom International

Administration, Management in the Operation and Maintenance of the Main Datacenter of Tigo Bolivia and Paraguay, service that includes the Monitoring of all the infrastructure of the Datacenter, Measurements of energy, climatization, security, Supervision of suppliers for facilities, preventive and corrective maintenance, Maintenance of the technical documentation of the Datacenter, development and fulfillment of processes and certifiable methodology Uptime Institute in the sustainable operation of the Datacenter (Year 2018-2019)

Similar projects

YPFB Andina

Design, provision and installation of its Datacenter infrastructure to house high heat and energy density equipment (blades) in a very small space, which complies with the TIA-942 Tier II standard (Year 2012).

CRE

Replacement of all the energy infrastructure and redesign of the existing datacenter in a turnkey format, project that includes the redesign of all the energy infrastructure, precision air, main connection and fire systems in a high availability format (Year 2011)

Banco Mercantil Santa Cruz

Design, assembly and adaptation of a 150KVA "Tier III" Datacenter, segmented into Equipment, Network, UPS, Power, NOC, Test and Supplier rooms. Includes a Precision N+1 Cooling system for each room with Redundant Chillers and NFPA- 2001 Fire System for all critical environments (Year 2019-2020)

DGIC Ministry of Finance

Investment project study consultancy for the construction of a data centre for the Ministry of Finance of the Government of Paraguay. Analysis, studies, design and assembly of a 1000 mts2 Datacenter complying with the "Telecommunications Industry Association" standard (TIA-942), ISO 14000, ISO 17799/27001 and the BCI ("Business Continuity Institute") standard and complying with the "Tier III" standard (Year 2012)

National Tax Service

Design, assembly and adaptation of a "Tier III" Datacenter in two Phases of 120KVA each, segmented in Equipment, Networking, UPS, Power, NOC, Test Room and Suppliers rooms. Includes a N+1 Precision Cooling system for each room with Redundant Chillers and NFPA- 2001 Fire System for all critical environments (Year 2019-2020).

Nuevatel

Construction of 350 sites (Technical Rooms) in 9 phases, including cooling, power, fiber and copper cabling, rack mounting, power regulation, up to switch configuration (Year 2013 -2016)

Bolivia