Entel

Security equipment with HA, Next Generation Threat Prevention for corporate network, VPN, support services, management and monitoring (Year 2017)

Mosaic International

Next Generation Threat Prevention Appliance, Wired Security Teams, including Professional Services and Collaborative Standard Support (Year 2016)

Entel

Expansion of the VSP Enterprise High End Storage system with additional 300 TB and redundant NAS modules to enable a VDI solution for 300 virtual workstations (Year 2014).

Repsol

Design, Construction, Turnkey Implementation that meets the TIA-942 standard and exceeds Tier III level (Uptime Institute), with capacity to accommodate 16 racks in an environment with precision air conditioning, UPS regulated power, fire systems, backup generators and biometric access control mechanisms (Year 2011).

Union Bank

Design, assembly, construction and adaptation of a Datacenter "hot" with capacity for 10 Racks, 2 air inrows, 2 UPS with autonomy of 8 hours, false floor, hot aisle containment, fire system and other subsystems for compliance with the standard "Tier II" (Year 2013-2014).

Nuevatel

Construction and adaptation of 300 outdoor and indoor sites (Radiobases) and antennas (Civil Works) (Year 2009-2013)